Stand Alone Solar PV Training at Moora Moora Coop

Solar Stand Alone Short Course (Swinburne University of Technology)

Images from Glen Morris’s stand alone power systems course at Moora Moora Community Coop (Healesville, Victoria). This is the practical component (3 days) of the nine day course. Students are required to complete a range of tasks including: checking flooded and VRLA batteries, downloading performance history from inverters and charge controllers, and installing PV modules, inverters, batteries, isolators and d.c. cabling.

Installing a PV powered solar water heating system (aka "Hot PV")
Installing a PV powered solar water heating system (aka “Hot PV”)
Connecting PV panel mounting rails
Connecting PV panel mounting rails
SPS Moora Moora July-6
“Hot PV” system being installed. Bottom row of PV heats water only.
Checking cell voltages on battery bank
Checking cell voltages on battery bank
SPS Moora Moora July-15
Downloading performance history from Flexmax 60/80 charge controllers
Water ram at Coop spring
Water ram in action. Uses falling water to pump water.
SPS Moora Moora July-25
Walking up from visiting the water ram

Mounting inverter

Fitting SP Pro inverter to renovated house.

Connecting battery leads

Installing the battery voltage sensing cables. The SP Pro inverter uses three sense wires so that it can monitor the actual battery voltage when high currents are flowing in the battery leads and to measure the voltage of each half of the battery bank so that it can check for a weak cell in the bank.

Heat shrinking cables

Heat shrinking the battery cables

fitting out the stand alone power room

Installing the AERL charge controller

IMG_8880

View from Mount Toolebewong (Moora Moora Coop)

IMG_8876

Drawing stand alone system wiring diagrams

IMG_8875

Buddhist prayer flags

IMG_8873

Home garden

IMG_8864

Microhydro supply line

IMG_8861

Assessing an old stand alone power system (SPS)

IMG_8855

Old SPS system (24V array)

IMG_8850

Cleaning the tops of batteries

IMG_8836

Checking some flooded batteries with hydrometer

IMG_8833

Eight year old battery enclosure – still going strong

IMG_8805

Ground mount system

IMG_8796

Downloading the history from inverter

IMG_8795

Analysing the data

IMG_8788

Retrieving charge controller history manually

IMG_8784

Checking for hot cells or hot spots on existing array

IMG_8782

Tea time in the kitchen

IMG_8773

Susanna, our chef, preparing lunch

IMG_8771

Another delicious lunch

IMG_8769

30 year old PV modules on “test” shed

IMG_8764

Wombat Hollow Cluster

IMG_8763

1.75kW PV system on shed attached to house

SPS Moora 27 June

Microhydro “Streamengine” 2kW turgo turbine

SPS Moora 27 June-4

Microhydro inverter and controller

SPS Moora 27 June-9

Selectronic SP Pro 241 being programmed on site

SPS Moora 27 June-17

Class visit to Selectronic’s factory in Chirnside Park

SPS Moora 27 June-22

Ivan Carter of Selectronic giving the students some tips on setting up an a.c. coupled system

SPS Moora 27 June-23

Selectronic’s most common installer fault – not sufficiently tightening the main battery cables

 

6 Replies to “Stand Alone Solar PV Training at Moora Moora Coop”

  1. The CEC have told me that I require to complete the course UEENEEK127A – Diagnose and rectify faults in renewable energy control systems – which is not available, at the moment, here in Adelaide. does your proposed course cover this subject? So that I can achieve full accreditation for SPS. I have already completed the Selectronics SP PRO Accredited integrator training program for off grid and solar hybrid systems.
    Regards
    Brian Hunter

    1. Hi Brian, good news, the CEC have just dropped the requirement for K127A for SPS accreditation. They should have updated their “Training Units with Mapping” document by CoB today.

      Glen

Leave a Reply to simon hopper Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.